{"id":416,"date":"2009-06-06T11:45:59","date_gmt":"2009-06-06T07:45:59","guid":{"rendered":"https:\/\/www.desertsun.co.uk\/blog\/?p=416"},"modified":"2010-11-17T20:02:29","modified_gmt":"2010-11-17T19:02:29","slug":"doing-business-in-russia-part-2","status":"publish","type":"post","link":"http:\/\/www.desertsun.co.uk\/blog\/416\/","title":{"rendered":"Doing Business in Russia &#8211; Part 2"},"content":{"rendered":"<p>A colleague forwarded this to me, sourced from <a href=\"http:\/\/www.doingbusiness.org\/ExploreTopics\/DealingLicenses\/Details.aspx?economyid=159\">here<\/a>.\u00a0 It describes the procedures, time, and cost to build a warehouse in Russia.<\/p>\n<p>Data as of: January 2008<br \/>\nEstimated Warehouse Value: RUB 26,120,000<br \/>\nCity: Moscow<\/p>\n<table border=\"0\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td style=\"width: 39px;\"><strong><span style=\"font-size: xx-small;\">No:<\/span><\/strong><\/td>\n<td style=\"width: 413px;\"><strong><span style=\"font-size: xx-small;\">Procedure<\/span><\/strong><\/td>\n<td style=\"width: 124px;\"><strong><span style=\"font-size: xx-small;\">Time to complete:<\/span><\/strong><\/td>\n<td style=\"width: 118px;\"><strong><span style=\"font-size: xx-small;\">Cost to complete:<\/span><\/strong><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">1<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Apply for an act of permission for use (\u00d0\u0090\u00d0 \u00d0\u02dc) to the Department of City Planning Documentation Development at the Architecture and City Planning Committee of Moscow (MoskomArchitektura).<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">2<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain situation plan of district and conclusion for a District Land Commission from the Architecture Planning Department (APD)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">15 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 43,680<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">3<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain a conclusion from Territorial Union of Land Use Regulation (TOP\u00d0\u2014)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">15 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 4,330<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">4<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain a decision by the District Land Commission on land plot provision and city planning regulation<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">5<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain clearance of draft disposition of Prefect with the Architecture Planning Department (APD)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">7 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">6<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain clearance of draft disposition of Prefect with the local government<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">7 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">7<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain clearance of draft disposition with the Territorial Union of Land Use Regulation (\u00d0\u00a2\u00d0\u017e\u00d0 \u00d0\u2014)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">7 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">8<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain the disposition on preparation of an act of permission for use (\u00d0\u0090\u00d0 \u00d0\u02dc) by the Prefect<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">7 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">9<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain a conclusion on compliance of the proposed building with specified city planning and territory use regulations<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">152 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 4,500<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">10*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain technical conditions from water and sewage services<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">45 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 17,673<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">11*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain technical conditions for an electricity connection with MosEnergo<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 5,490,520<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">12*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain technical conditions to connect to telephone line<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 3,000<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">13*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval from MoskomArchitektura on engineering of the facility<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">14 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 4,500<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">14<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain an act of permission for use (\u00d0\u0090\u00d0 \u00d0\u02dc) from MoskomArchitectura<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 6,700<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">15<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain disposition of Prefect on the inception of construction design (decision on construction)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">60 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">16<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of design conditions by the Department of Well-Being of MoskomArchitektura<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">7 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 53,300<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">17*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of design conditions by the Department of Preparation of Project Approvals of MoskomArchitektura<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">14 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 12,100<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">18*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of design conditions by local government<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">7 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">19*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of design conditions by the Prefect\u00e2\u20ac\u2122s Office<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">14 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">20*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of design conditions by the Emergency Situation and Civil Defense Department<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">14 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 14,728<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">21*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of design conditions by Moscow State Expertise<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">14 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 7,364<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">22*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain an act of the Moscow Geological-Geodesic Department<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">15 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 36,700<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">23*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of design conditions by the Sanitary Services (Rospotrebnadzor)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 13,800<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">24*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of transport routes from the Moscow City Transport Agency<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 8,837<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">25*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval from the State Inspectorate of Road Safety (GIBBD)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 8,837<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">26*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval from the Department of Comprehensive Well-Being of the city<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 4,600<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">27*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval from the Department of Nature Use under State Ecological Expertise<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">21 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 29,455<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">28<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain Sketch No. 2 from the Moscow Geological Institute<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 10,100<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">29<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of Sketch No. 2 from the Moscow Architecture Committee (MoskomArchitektura)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 4,000<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">30<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain the construction passport from the Moscow Geological Institute<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 8,837<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">31*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of volumes of \u00e2\u20ac\u0153outline of construction arrangement\u00e2\u20ac\u009d and \u00e2\u20ac\u0153GenPlan\u00e2\u20ac\u009d from MoskomArchitektura<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 6,500<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">32*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of volumes of \u00e2\u20ac\u0153outline of construction arrangement\u00e2\u20ac\u009d and \u00e2\u20ac\u0153GenPlan\u00e2\u20ac\u009d from the Prefecture<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">33*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain approval of volumes of \u00e2\u20ac\u0153outline of construction arrangement\u00e2\u20ac\u009d and \u00e2\u20ac\u0153GenPlan\u00e2\u20ac\u009d from the GenPlan Institute<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 12,200<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">34<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain Regulation No. 2 and certificate of approval of Architectural City Planning Decision<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 3,600<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">35<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain project approval by Moscow State Expertise<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">60 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 58,000<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">36<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and obtain permission for construction (building permit)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">10 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 11,460<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">37<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the State Inspectorate of Architecture and Construction Supervision during foundation construction<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">38<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the State Inspectorate of Architecture and Construction Supervision during structure construction<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">39<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the State Inspectorate of Architecture and Construction Supervision during engineering works<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">40<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the Union of Administrative Technical Inspection (UATI) &#8211; I<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">41<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the Union of Administrative Technical Inspection (UATI) &#8211; II<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">42<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by Union of Administrative Technical Inspection (UATI) &#8211; III<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">43<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the Union of Administrative Technical Inspection (UATI) &#8211; IV<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">44<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the Union of Administrative Technical Inspection (UATI) &#8211; V<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">45<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the Union of Administrative Technical Inspection (UATI) &#8211; VI<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">46<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Receive inspection by the Union of Administrative Technical Inspection (UATI) &#8211; VII<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">47<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Connect to water services<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">48*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and receive inspection by the Energy Supervision Board<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">1 day<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">49<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Connect to electricity and sign an agreement with Energosbyt<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">14 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">50*<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and connect to telephone services<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">5 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">51<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and convene the Approval Commission<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">52<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and receive the disposition on operation of building (occupancy permit)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">10 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">no charge<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">53<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Request and receive plans from the Bureau of Technical Inventory (BTI)<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 55,000<\/span><\/td>\n<\/tr>\n<tr>\n<td style=\"width: 39px;\"><span style=\"font-size: xx-small;\">54<\/span><\/td>\n<td style=\"width: 413px;\"><span style=\"font-size: xx-small;\">Register the building after completion<\/span><\/td>\n<td style=\"width: 124px;\"><span style=\"font-size: xx-small;\">30 days<\/span><\/td>\n<td style=\"width: 118px;\"><span style=\"font-size: xx-small;\">RUB 7,500<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div><span style=\"font-size: xx-small;\">* Takes place simultaneously with another procedure<\/span><\/div>\n<p>54 different bureaucratic hurdles to overcome in order to build a warehouse.\u00a0 And it should be noted that the costs listed are the official costs only, which the authority in question can legally charge.\u00a0 Often before an authority will consider an application, the submitted documents must be checked and approved by a third party private company which is the only one the authority will recognise, and hence can charge what it likes.\u00a0 I have seen these companies charge $30k for &#8220;pre-approving&#8221; what the governmental authority charges $200 for, and it is not difficult to understand where a big chunk of this additional fee ends up.\u00a0 With so many authorities to satisfy the scope for corruption is enormous, and many of these approvals bodies have become industries in themselves offering lucrative careers involving little more than glossing over documents at ones leisure whilst accepting hefty backhanders either directly or via a third party company, which may or may not be owned by your brother.<\/p>\n<p>This list should give you some idea of how difficult it is to build an LNG facility or an offshore platform in Russia.\u00a0 Construction schedules in Russia are unlike anything you would experience in the west, which is made all the more difficult by the 4-month summer construction window (where groundworks are concerned) which exists in much of Russia including Sakhalin.\u00a0 For the last part of 2008 I was involved with the construction of a two-storey office building, the type of which would be thrown up in six or eight weeks in the UK.\u00a0 It took our Russian contractor over two years to complete, and still the building is not registered.\u00a0 A good chunk of this time was spent sitting about waiting for various authorities to review documents, turn up for inspections, and stamp bits of paper.<\/p>\n<p>If anyone wants to know why Russia remains poor despite a well educated population possessing impressive technical skills, looking at how long it takes to complete a simple construction project and what is involved is a good place to start looking.<\/p>\n<p><em>(Doing Business in Russia &#8211; Part 1 is <a href=\"..\/?p=413\" target=\"_self\">here<\/a>.)<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A colleague forwarded this to me, sourced from here.\u00a0 It describes the procedures, time, and cost to build a warehouse in Russia. Data as of: January 2008 Estimated Warehouse Value: RUB 26,120,000 City: Moscow No: Procedure Time to complete: Cost &hellip; <a href=\"http:\/\/www.desertsun.co.uk\/blog\/416\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[57,3],"tags":[],"_links":{"self":[{"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/posts\/416"}],"collection":[{"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/comments?post=416"}],"version-history":[{"count":2,"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/posts\/416\/revisions"}],"predecessor-version":[{"id":823,"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/posts\/416\/revisions\/823"}],"wp:attachment":[{"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/media?parent=416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/categories?post=416"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.desertsun.co.uk\/blog\/wp-json\/wp\/v2\/tags?post=416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}